Announcements
ARCHIVED AND NO LONGER RELEVANTMarch 09, 2016: ANNOUNCEMENT: Estimated MW-Measure and Seasonal Factors
We confirm that the seasonal factors announced on January 13, 2016 are unchanged. The seasonal factors are: 1.000 for summer (June to September) and 1.000 for non-summer (October to May).
The estimated MW-measure has been updated to 1% of the current PLC. The PLC reflects the exclusion of 17% of the PIPP Load for which supply will be procured through a separate RFP auction process (see Case No. 16-247-EL-UNC, where “PIPP” stands for Percentage of Income Payment Plan).
Product Type | Delivery Period | Tranche Size | Percentage at Auction | PLC (MW) | MW-Measure |
24-month |
June 2016 to May 2018
|
1% | 17% | 2,565 | 25.65 |